china-msa
  • SUBMARINE CABLE LAYING OPERATION ——GD0040

    GD0040 SOUTH CHINA SEA SUBMARINE CABLE LAYING OPERATION BY C/SFU HAI AND “TIAN YI HAI GONG” IN 500M BOTH SIDES FROM THE LINE JOINING 20-15.9N 111-36.4E20-28.7N 112-41.3E21-07.3N 114-10.2E21-22.0N 114-14.5E21-30.9N 114-29.1E21-54.7N 114-41.1E22-09.8N 114-30.1E AND IN 500M BOTH SIDES FROM THE LINE JOINING 21-46.4N 113-47.6E21-31.7N 114-09.9E21-30.8N 114-10.8E21-22.3N 114-13.5E21-22.0N 114-13.8E21-21.9N 114-14.2E21-22.0N 114-14.5E FROM 1 MAR. TO 30 SEP. SIGNAL LIGHTS AND SHAPES WILL BE EXHIBITED WIDE BERTH REQUESTED GUANGDONG MSACHINA