HB0092,BO HAI SEA ,RECONSTRUCT OIL PIPELINE AREA BOUNDED BY THE LINES JOINING
A 39-04.55N 119-10.58E
B 39-04.54N 119-09.33E
FROM 111600UTC OCT.TO 141000UTC OCT.BY “JULI”“HAIJIAN56”.
KEEP WATCH ON VHF CHANNEL 09.WIDE BERTH REQUESTED