china-msa
  • HB0108

    HB0108,BO HAI SEA ,RECONSTRUCT OIL PIPELINE AREA BOUNDED BY THE LINES JOINING

    A  39-04-45.64N  119-08-54.41E  

    B  39-04-46.43N  119-10-59.34E

    C  39-04-19.69N  119-08-54.73E
         D  39-04-20.48N  119-10-59.64E

    FROM 291600UTC OCT.TO 021600UTC NOV.BY “HENGTONGLAN5”“LIJINTUO5001”.

    KEEP WATCH ON VHF CHANNEL 09.WIDE BERTH REQUESTED